Sacrison Engineering

Mining  -  Geological  -  Hydrological  -  Environmental  -  Maintenance

Home  -  Contact  -  Links

U/G Service Water Regulation

Design, installation & maintenance engineering of 1,200 gpm supply across two shafts, with 1,925 vertical feet of in-shaft, on-station and ramp regulation.

 

Environmental Hydrology

Surface and groundwater analyses and monitoring including forensic engineering, monitoring locations and protocols, and excursion/flood routing evaluations.

 

Dump Leach, Triple Lining

Design, permitting and construction of a triple-lined valley fill leach pad, at schedule and costs equivalent to double-lined facilities.

 

Construction Management Project Management Engineering
  • Design

  • Permitting

  • Procurement

  • Contract

    • Specification

    • Preparation

    • Supervision

  • Diversion Structures

  • Sedimentation Control

  • Evaporation Control

  • Fill Dams

  • Drilling Programs

  • Instrumentation

  • Pert/CPM

  • MS Project

  • Schedules

  • Resources

  • Costs

  • Tracking / Analysis

  • Production

  • Dewatering

  • Grouting

    • Dams

    • Adit Plugs

    • Foundations

  • Monitoring

  • Storm Water Control

  • Evaporation Control

  • Rebound

  • Fill Dams

  • Containment Systems

Copyright 2017, Sacrison Engineering.
Questions about this site E-mail:
rsacrison@frontiernet.net
Web Site Designed & Hosted by:
Mining Internet Services, Inc.